SIGNAL & TELECOMMUNICATION

 

 

 

 

In General

 

Signalling

 

Telecommunication

 

Highlights

 

RTI Guidelines

 

CVC Guidelines

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

1.ORGANIZATION

 

The S&T branch is headed by Sr. DSTE who is assisted by 01 DSTE, 04 ADSTE and 05 supervisors in-charge.

 

2.STAFF STRENGTH

 

Category

Sanctioned strength

On Roll

Vacancy

Supervisor

81

76

5

Group ‘ C ‘

356

332

24

Group ‘ D ‘

303

319

-16

Total

740

727

13

 

POSITION OF SAFETY CATEGORY POSTS

 

Category

Sanctionedsstrength

On Roll

Vacancy

Remarks

SSE/sig

36

27

9

Indent of Two SSE/Sig Sent to NWR/HQ in Sept.2012

JE/sig

17

24

-7

3 Nos. App JE/SIG under Training out of 4 Nos. Panel received RRB.

MCF

64

67

-3

SM-I

124

76

48

12 Nos. SM-I passed trade test but 2 Year not completed

SM-II

31

34

-3

Two year not completed in present grade for Selection test passed 13 candidates. 20 SM-II panel received out of which 10 Nos. under training at STTC/SBI

SM-III

19

41

-22

15 candidates are under training on compassionate ground asSM III

SSE/ Tele

19

18

1

SSE/Tele/RGS

JE/Tele

9

8

1

MCF

23

25

-2

TCM-I

44

32

12

5 Nos. TCM-I passed trade test but 2 Year not completed

TCM -II

11

11

0

TCM -III

6

13

-7

3 Nos. DR Quota App. TCM Gr.III(CG) under training.

Total

403

375

28

 

 

 

 

 

 

3. SIGNALLING

 

3.1STANDARDS OF INTERLOCKING

 

Standard

Noof stations

Section

A.MACLS standardII ( R )

  1. EI

33

RE-RGS-FL-LR ( Ex RE & KSG)

  1. RRI

03

RE, BKI & JP

  1. PI

39

JP-SWM, FL- JP- RE & KSG

B.SEMAPHORE

  1. Standard III

02

RGS & JP

  1. Standard II

01

(BSGD)

  1. Standard I (MG)

05

JP-SIKAR

  1. MNI( MG )

16

JP-CUR, SIKR-LHU

(9 Stn. BG CONVERSION WORK PROGRESS)

3.2SYSTEM OF BLOCK WORKING

SYSTEM OF BLOCK WORKING

No. of Block Sections

Singleline Token less Block working

  1. JP- SWM Section

12

  1. BKI-AWR

6

  1. RPCSection

26

Singleline Token Block working

  1. JP-RGS-CUR –LHU( MG )

15

SIKR-LHU (9 Station BG CONVERSION WORK PROGRESS)

Double line Block working

  1. JP-MD

15

  1. JP-BKI

11

  1. AWR- AMRI

7

Continuous Track Circuiting

  1. RE- AMRI

1

 

3.3TRACK CIRCUITING

 

There is completetrack circuiting at all station sections in BG except BSGD where FM to FM main line track circuit is provided. This station is planned to be converted into ‘D’ class station. No track circuiting is provided in MG section.

.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

4.TELECOMMUNICATION

 

4.1CONTROL COMMUNICATION

 

Control

Section

Type of Signaling

Patching From

Main Line - 1

Jaipur – Madar

(16 Stations)

DTMF on OFC

Automatic Protection Path on E1 level.

Main Line - 2

Jaipur – Bandikui – Sawai Madhopur

(25 Stations)

DTMF on OFC

Automatic Protection Path on E1 level On OFC

Main Line - 3

Bandikui – Rewari

(16 Stations)

DTMF on OFC

Automatic Protection Path on OFC

RPC

Ringas – Phulera – Rewari

(27 Stations)

DTMF on OFC

Automatic Protection Path on E1 level On OFC

Loharu

Jaipur – Sikar – Churu – Loharu

(25 Stations)

PULSE (STC)

Sikar (BSNL Channel) Churu (OFC), LHU on OFC Channel.

4.2AUTO TELEPHONE EXCHANGE

 

Location

Exchange

Port Capacity

Intercom

WLL Exchange

NWR HQ

Coral Tadiran

1500

Coral Tadiran & Byte

JP

Coral

3000

IRIS Ivdx Coral

BKI

C-DOT

256

AWR

Flexicom 4000

256

RE

Coral Tadiran

750

FL

Flexicom 4000

256

SIKR

Siemens

256

GTJT

Coral Tadiran

       256

 

 

 

 

 

 

 

4.3OTHER TELECOMMUNICATION CIRCUITS

 

BSNL Telephones with caller ID and 25 watt VHF sets have been provided at all 97 stations over the division.

 

 

5 PASSENGER AMENITIES

 

Type of Amenity

Nos

Locations

Computerized Announcement System

9

RE, AWR, BKI, DO, GADJ, JP, FL ,KSG, SIKR

Conventional PA System

12

KRH, DPA, BNLW, CKB, ISA, RGS, SNGN, NMK, GTJT,NNL, SIKR, GADJ

Digital Clocks

9

RE, AWR, BKI, DO, GADJ, JP, FL ,KSG, SIKR, KRH, RHG

Train Indication Board

12

RE, AWR, BKI, DO, GADJ, JP, FL ,KSG, KRH, RHG

Coach Indication System

7

RE, AWR, BKI, DO, GADJ, JP, KSG

Electronic Train Charting

1

JP(PF No.1)

 

 

 

6PERFORMANCE(AS PERFOIS)

 

Sr. No

Item

2010-2011

2011-2012

2012-2013

2013-2014 (up to May. 13)

2014-2015 (up to May. 14)

% Variation w.r. tolast year

1

Signaling incidences

 

708

502

352

 

97

49

-49.48%

2

Signal Incidences per 1000 DESU per month

0.57

0.36

0.25

0.20

.20

-20%

 

 

 

 

 

 

 

 

 

 

 

 

 

 

7 HIGHLIGHTS.(2014-15)

1Media diversity through OFC has also been achieved on recently commissioned HASSDAC in GTJT-KWP section (in March) .Now both Quad cable & OFC communication is available for these axle counters.

2Four Nos. New IPS make Statcon with Version RDSO/SPN/165/2012 for 4 Line is commissioned at Hirnoda, Asalpur Jobner, Bobas and Dhanakya Station.

3ELD connected with Data Logger on Total 34 Nos. Station of Jaipur Division.

4Electrical Lifting Barrier Provided on LC Gate No:-142 (BU-RHG section) with up-gradation work in RE-BKI Section. (Total 2 Nos. LC Gates provided with Electrical Lifting Barrier up to current month during the year 2014-15).

5Emergency Slide Boom Locking arrangement provided at LC Gate:-219 (GADJ-JP), 93 (KRH) and 102 (SMPR-RGS) in RE-JP and RPC Section. (Total 5 Nos. LC Gates provided with Emergency Slide Boom Locking arrangement up to current month during the year 2014-15).

6Separation of Calling on and Home Signal HR Fuses done on Isarda, Chauthkabarwara, Devpura and Durgapura station. (Total 19 Nos. Station with Separation of Calling on and Home Signal HR Fuses done up to current month during the year 2014-15).

7Over aged 110 V/300AH Battery bank of Signal Lightingreplaced (Total 55 Nos. Batteries) at Rewari station.

848 Nos. Over aged 2V/80AH Track Battery replaced Bheslana, Renwal, Dhankaya, Kanakpura station. (Total 98 Nos. Over aged 2V/80AH Track Battery replaced up to current month during the year 2014-15).

9PPTC Fuse is provided at Gandhinagar, Sheodaspura, Isarda, Chauthkabarwara, Devpura, Gegal Akhri, Mandavariya , Bobas, Dhanakya, Peepli Ka Bas and Khandel Station.

10Up Gate Stop Signal (GF-4) of LC Gate 142 (BKI-AWR Section) shifted from Right Hand Side to Left Hand Side .

11Circuit Modification in indication and aspect of distant Signal has been completed at Sri Madhopur station departmentally as per EI guideline issued by NWR/HQ. (Total 53 Nos. stations Circuit Modification completed up to current month).

12Six No’s worn out point machine (Pt. No. 106,113,124,161,167 at JP Yard, Pt. No. 104 at KWP Yard ) replaced with new point machine. (Total 9 Nos. worn out point machine up to current month during the year 2014-15).

13Six Nos. Ground connection of Point Machine replacement work has been completed in Khatipura & Jaipur Yard. (Total 26 Nos. Ground connection of Point Machine replacement work has been completed up to current month during the year 2014-15).

14Total 385 Nos. Exothermic track bonding provided at Asalpur Jobner, Kanakpura , Dhanakya and Bobas in JP-FL section . (Total 1000 Nos. Exothermic track bonding up to current month during the year 2014-15).

Telecom:-

15.Train Arrival/Departure Information display LED TV systems have been installed on DPA and RGS station. The software has provision to display all the coaches of train also.

16.IT Initiative :-Four Nos. New DSLAM Modem connection provided for Railnet at Jaipur Station. (Total Six Nos. DSLAM Modem provided up to current month during the year 2014-15).
17. 2 Nos. New 2 Mbps FOIS channels on Railway OFC have been connected between JP-KKU and KKU-FL section on Jaipur division.


16. Dismantling of overhead alignment is Completed in JP-SWM Section.

17. 10 Tones telecom scrap materialsent to Ajmer Store for DS-8 from SSE/Tele/JP comprise of old MW equipments.

18. 2 set of VRLA battery (48V/200AH) replaced at Mahwa and Khairthal Station.

8 OTHER HIGHLIGHTS. (2013-2014)

8.1Signalling

1.Equipment Training program for Single Token Less Block Instrument organized from 21.01.2014 to 25.01.2014 by the Podanur Training School instructor, Southern Railway at SSE/Signal/Jaipur Office and Total 45 Nos. S&T staff attended from all four division of North Western Railway.

2.New Data Logger Maintenance Centre commissioned at DRM/JP Office. And Auto generation of SMS from database for various exceptions is also functional as an aid to maintenance field staff in real time.

3.Solar panel (81Nos/80 W each) provided for IPS Battery charging at 16 stations up to current month during the year 2013-14. (Devpura, Isarda, Banasthali Niwai, Channani, Chaksu, Sheodaspura, Sanganer, Durgapura, Siras,Chauth ka Barwara, Jatwara, Bhankari, Baswa, Rajgarh,Khatipura & Mawha).

4.New version Data logger (99/2006) with 1280 digital & 32 analog input commissioned at Khatipura, Araniya , Bhankari, Asalpur Jobner, BobasDhankya, Getor Jagatpura, Dausa, Jatwara, Jhir, Kanauta, Bassi and Bandikui Stations. (Total 13 Nos. stations up gradation completed up to current month during the year 2013-14).

5.Total 136.75 tones scrap (Ferrous:-85.385 tones, Non Ferrous:-49.290 tones, Mild Steel:-1.405 tones, Plastics:-670 Kg) sent to Ajmer Store for DS-8 from SSE/Signal/Jaipur, Bandikui& Phulera Store office in the month of January 2014.(Total 251.12 tones scrap sent in the year 2013-14).

6.Over aged 110 V/200AH Battery bank of IPS replaced with 110V/300AH Battery Bank 1826 No. battery at 28 stations has been replaced up to current month.

7.LC Gate No.182 (DO-JW), LC Gate No:-92(KRH-.HSI) & 95,96(KRH-PSL) in RE-JP section have been interlocked & commissioned. (Total 4 Nos. LC Gates interlocked & commissioned up to current month during the year 2013-14).

8.Emergency Slide Boom Locking / Key Chain arrangement provided at LC Gate :-23,49(JP-SWM) ,189(JW) ,151(JP-RE) ,182(DO-JW), 202(BAI), 195(JR),69(BWL),70(BWL) 229(KKU-JP), 228 (JP-KKU),128 (MKH Yard) ,108 (RGS Yard) , 222 (JP-BSGD) & 82C(BSGD-DPA). ( Total 14 Nos. LC Gate provided with ESB and 01 Nos.LC Gate provided with Emergency Key Chain Interlocking up to current month during the year 2013-14)

9.Electrical Lifting Barrier Provided on LC Gate No:-249 & 1 at Phulera ,78 at Sanganer , 243 at Asalpur Jobner , 157 ,156 at Bandikui ,211 at Khatipura , 73 at Sanganer , 193 at JR-JW Section& 151 at Baswa station.( Total 10 Nos. LC Gate provided with ELB up to current month during the year 2013-14).

10.New IPS of Version RDSO\SPN\165\2012 make Statcon is commissioned at Jaipur, Bandikui and Khairthal (Separately for LC gate) Station.

11.In Kathuwas Yard, ELB of LC 20 Shifting work was done in connection of CONCOR siding.

12.‘B’ Type Chokes , Batteries and QTA2 relays for track circuits areprovidedin connection of Railway Electrification work of AWR-RE Section.

13.Total 50 Nos.Points Machines replaced up to current month during the year 2013-14.

14.During DFCCIL Utility Shifting work, all main cable tail cable and Location shifting work completed at Mirzapur Bachod station.(Total 4 Station completed out of 6 Station in RE-DBLA Section) .

15.Circuit Modification in indication and aspect of distant Signal has been completed on all Panel Interlocking stations (Total 50) in Jaipur Division up to current month.

16.Total 1221 Nos. FRP Type TLJB replaced in Jaipur Division as a theft prone measure during 2013-14.

17.Track Feed charger with Potentio-free contact is connected with Data logger for failure alarm on Total 15 Nos. Station up to current month during the year 2013-14.

18.Shifting of Starter Signal to the boundary of track circuit ahead is completed at Sanganer, Durgapura, Banasthali Niwai, Chaksu, Channani , Siras , Isarda, Chauth Ka Barwara andSheodaspura, Devpura Station (Total 10 Nos. Stations, Shifting of Starter Signal to the boundary of track circuit ahead is completed up to current month during the year 2013-14).

19.Due to DFCCIL infringement, the shifting work was completed of Electric Lifting Barrier on LC Gate 13 at Pali Station in RPC Section.

20.Signal S-31 in Rewari Yard and Signal S-46 of Chaksu are shifted from Right Hand Side to Left Hand Side.

21.Road User Signal and Warning Bell provided on LC Gate:-114 in the Alwar Yard.

22.Fuse Monitoring & Automatic Changeover System commissioned at Banasthali Niwai, Chaksu, Durgapura, Sanganer and Sheodaspura station in JP-SWM section. (Total 05 Nos. Station provided with Fuse Monitoring system up to current month during the year 2013-14).

23.Seven Nos. additional 20KVA DG Sets provided on Khori, Pali, Kund, Kathuwas, Ateli ,Mirzapur Bachod and Narnaul station

24.Total 312 No’s Track Feed charger with Potentio-free contact installed up to the current month during the year 2013-14.

25.Total 9 No’s wooden sleeper point replaced by PRC up to the current month during the year 2013-14.

26.The provision of Red Aspect of Road User signal During Emergency Key Chain Interlocking provided on all interlocked LC Gate in AWR-RE Section and LC Gate 247,246 & 245 in JP-FL Section.

27.Improved Lighting Protection arrangement (B, C & D Class) is provided at Total 13 Nos. Station up to current month during the year 2013-14).

28.Total 12 Nos. DLBI (JP-FL section) of Due Periodical Over-hauling have been replaced during the year 2013-14.

29.The facility of Dead Approach Locking for Gate signal is provided on LC Gate:-91 in (Khairthal-Harsouli).

30.Total 10 Nos.Track Circuit involving more than 2 points Bifurcated up to current month during the year 2013-14.

8.2 Telecommunication

1.STM-1, PD MUX and Way Side Equipment commissioned on all 13 stations between NMK-RE section. Optical Fiber has been lit in the complete RPC section and all 27 stations have been commissioned.

2.Train Traffic Control Communication has been shifted from Quad cable to OFC equipment in RPC section and is working satisfactorily.

3.All UTS/PRS circuits have been transferred on Railway OFC in RPC section. Now all 25 stations are working on Ring Protection in this section. This resulted in surrendering of BSNL circuits and a saving on recurring charges of Rs. 17 Lacs is achieved.

4.Passenger Amenities:- 2 Nos. Multiline Train Display Boards 5 lines and 10 lines commissioned at Jaipur Station. 10 Nos. Single Line Double face A/D Train Display Boards installed at platform 1, 2 and 3.

5.IT Initiative:- Rail net Facility provided to SSE/Signal/RGS , IPF/RGS , JE/SIG/GADJ and RPF/GADJ Office.

6.Additional ADSL cards of 12 Ports installed at Phulera and Bandikui Exchange for expanding subscriber of DSLAM.

7.OFC Connectivity provided for rail net at Ganpatinagar MW, Loco Rest House, PRS, DRM Office , GM Bungalow , Panipech officer Railway colony.

8.TV Display System for Enquiry commissioned on Jaipur station for current position of train arrival and departure for manual enquiry.

9.12 No’s CCTV camera commissioned at Rewari Station.(Total 27 camera.)

10.STM-1 and PD-MUX provided in between MW, PRS & DRM Office. All UTS/PRS circuit transferred from Quad cable to OFC media of MW,PRS & DRM office.

11.318 Nos.DSLAM Modem connection provided for Rail net in jaipur division up to current month during the year 2013-14.

12.Dedicated OFC Connectivity with 4 E1 and 2 Ethernet port is provided between NWR HQ and Getor Jagatpura Telephone Exchange.

13.New PA system installed in Arawali Auditorium/Jaipur and RPF Zonal Training centre conference room/Bandikui.

14.RPC STM1 Link extended from Phulera to Jaipur by providing 6 STM-1 equipment of improved version & capacity of 32 E1s.

15.In ISS Work, 74 No’s CCTV camera commissioned at Jaipur Station.

16.NMS for STM1 ( Total 33 Nos. STM1 nodes) in RPC Section is installed and commissioned in Test Room, Jaipur.

17.Telecom Wiring is done on 380-Work Station on Modular Furniture at NWR/HQ.

 

RTI GUIDELINES

 

SUO MOTU DISCLOSURE UNDER SECTION 4 (1) b

1.The particulars of its organization, functions and duties- Attached in web link

2. The Power and duties of its Officers and Employees- Attached in web link
Duty List

3.The procedure followed in the decision making process, including channels of supervision and accountability - Attached in web link

4.The norms set by it for the discharge of its functions
As per the prescribed norms of Rly Bd, regarding rules, regulations, instructions and manuals the officer is discharging its functions –

5.The rules, regulations, instructions, manuals and records, held by it or under its control or used by its employees for discharging its functions SEM Part-1, SEM Part-2, Telecom Manual and G&SR

6. A statement of the categories of documents that are held by it or under its control Signal Engineering Manuals Part-1, Signal Engineering Manuals Part-2, Telecom Manual and General  & Subsidiary Rules

7.The particulars of any arrangement that exists for consultation with, or representation by, the members of the public in relation to the formulation of its policy or implementation thereof
– Not Applicable for S&T –

8.A statement of the boards, councils, committees and other bodies consisting of two or more persons constituted as its part or for the purpose of its advice, and as to whether meetings of those boards, councils, committees and other bodies are open to the public, or the minutes of such meetings are accessible for public – Not Applicable for S&T –

9.
A directory of its officers and employees - Attached in web link

10.The monthly remuneration received by each of its officers and employees, including the system of compensation as provided in its regulations –  Not Applicable for S&T –

11.The budget allocated to each of its agency, indicating the particulars of all plans, proposed expenditures and reports on disbursements made –  Not Applicable for S&T –

12.The manner of execution of subsidy programmes, including the amounts allocated and the details of beneficiaries of such programmes –  Not Applicable for S&T –

13.Particulars of recipients of concessions, permits or authorizations granted by it –  Not Applicable for S&T –

14.Details in respect of the information, available to or held by it, reduced in an electronic form
– Information Available on web site  – http://www.nwr.indianrailways.gov.in/view_section.jsp?lang=0&id=0,1,291,360,484

15.The particulars of facilities available to citizens for obtaining information, including the working hours of a library or reading room, if maintained for public use –  Not Applicable for S&T –


16.The names, designations and other particulars of the Public Information Officers – Not Applicable for S&T –

17. Such other information as may be prescribed and thereafter update this publications every year. Updates are done every year –


 


CVC GUIDELINES

1.Registration of contractors/ suppliers/ vendors for expenditure Contracts for which registered/approved list is maintained. – Nil --

2.Registration of contractors for earning contracts for which registered/Approval list is maintained. – Nil --

3.Registration of firms Trade group wise and category wise in respect of Procurement to be done by Stores Department. – Nil --

4.Registration of firms/Hospitals for medical supplies/Health care. – Nil --

5.Renewal of registration/re-registration in respect of items 1, 2, 3 & 4 above. – Nil –

6. Approval of vendors by RDSO (both as Part I or Part II source) along With Directorate Operating Procedure (DOP) and Schedule of Technical Requirement (STR). Similar action should be taken by CORE, DLW, CLW, ICF, RCF for approving sources for the items Allotted to them.

7. Renewal of approval of vendors by RDSO (both Part I & Part II Sources) by RDSO, CORE, DLW, CLW, ICF & RCF.

8. Up gradation of a vendor from Part II list to Part I list.

9.Licenses of RTSA & CBA. – NA –

10.PCO booth licenses. – NA –

11.Commercial plots. – NA –

12.Stacking permission. – NA –

13.Leasing for Food Plazas. – NA –

14.‘Pay and use’ toilet licenses. – NA –

15.Parcel handling & transshipment licenses. – NA –

16.Registration of indents and allotment of rakes. – NA –

17.Tourist car, coach and train booking. – NA –

18.Application forms for claims compensation. – NA –

19.Application forms for Refund of freight & fare. – NA –

20.Waival of Demurrage and wharfage. – NA –

21.Appointments as consultant Doctors on contract & its renewal. – NA –

22.Appointments against Cultural quota, Sports quota, Handicap quota And Scouts & Guides quota. Vacancies/examination dates for these should also be on the Website. – NA –

23.Cases requiring appointments on compassionate grounds. – NA –

24.Status of all bill payments to contractors/ suppliers etc. 

25. Recruitment by Railway Recruitment Boards and RPF/RPSF. – NA –

a.Employment notices indicating vacancy position, category, State (in case of RPF/RPSF only), community wise, eligibility Criteria etc.

b.Clear position of receipt of applications with necessary Information.

c.Details of rejection of applications.

d.Details of issue of call letters.

e.Date, time and venues of examinations.

f.Publication of results and panels.

g.Information regarding withholding of result or cancellation of Examination.

26. Details of Tenders/Works Contracts of value > Rs.1Crore in respect of Engineering/Mechanical/Electrical/S&T & Medical departments, Rs.50 lakhs for Commercial department and all purchases of value > Rs.20 lakhs done through Stores Contracts. Additional details actual date of start of work/actual date of completion/reasons for delays, if any.

27. Monthly summary of all Works contracts/purchases as per sl. 26.

28.All Types of Licenses, permissions, clearances. – NA –

29.All applications forms/proformas should be available on website in downloadable form. After receipt of application forms, the deficiencies found about documents/information submitted. – NA –

30.Status of individual applications/matters should be made available. – NA –

 




Source : North Western Railway / Indian Railways Portal CMS Team Last Reviewed on: 12-12-2014  


  Admin Login | Site Map | Contact Us | RTI | Disclaimer | Terms & Conditions | Privacy Policy Valid CSS! Valid XHTML 1.0 Strict

© 2010  All Rights Reserved.

This is the Portal of Indian Railways, developed with an objective to enable a single window access to information and services being provided by the various Indian Railways entities. The content in this Portal is the result of a collaborative effort of various Indian Railways Entities and Departments Maintained by CRIS, Ministry of Railways, Government of India.